Installation planning

L sealer power requirements

Power requirements vary between semi-automatic sealers, automatic L sealers and heat shrink tunnels. Site utilities should be checked before quotation.

L sealer power requirements
L sealer power requirements advice from Lancing UK.

When this search applies

Power requirements vary between semi-automatic sealers, automatic L sealers and heat shrink tunnels. Site utilities should be checked before quotation.

  • Single phase versus three phase
  • Tunnel power requirement
  • Plug and isolator planning
  • Electrical access and installation checks

Why power matters

The heat tunnel normally has the highest electrical demand. A machine choice should be matched to the site supply as well as product requirement.

Site preparation

Confirm voltage, phase, available amperage and whether an electrician is needed before delivery or installation.

Information to send for an accurate recommendation

Pack dimensionsLargest and smallest product sizes, pack weight, stability and whether products are single cartons, bundles or trays.
Required outputTarget packs per minute, daily volume, shift length, changeover frequency and whether future output may increase.
Film and finishPreferred shrink film if known, presentation requirements, seal position, retail display needs and barcode visibility.
Line layoutAvailable floor space, infeed method, conveyor height, power, compressed air and whether a shrink tunnel is needed.

FAQ

L sealer power requirements FAQs

Can a shrink tunnel run on single phase?

Some smaller systems may, but many tunnels require three phase supply.

Should power be checked before quote?

Yes. It prevents specifying a line that the site cannot support.

Who confirms final electrical details?

Final electrical connection should be confirmed by a qualified electrician or site engineer.